Sheffield Forgemasters has begun tunnelling work on a new flood prevention system in Sheffield, using a tunnel boring machine to excavate a 320-metre tunnel beneath Brightside Lane as part of the firm’s wider £1.3bn recapitalisation programme. The scheme, centred on a new Bagley Brook transfer system, is designed…
Story source🔎 Sheffield ↗View on TalkFuse ↗
The story comes from TalkFuse. The discussion below is local to Sheff.Events.
Leave a Reply